TIPS FROM EXPERTS |
- Do Not Paint the flat immediately after external crack filling & painting work. Please wait for 12 to 18 Months for drying wall totally.
- Seal the entire window sill with silicon sealant or m-seal.
- Drill the aluminum track of window to drain out water from the track.
- Fill the scarting and tiles joints properly to avoid seepage.
- Use cement base putty minimum 3' - 0" fit above the scarting level during internal painting.
- Drill the box Hollow elevation by minimum 1" to 2" Dia two hole.
- Do not hammer or do fix the furniture dead wall.
- Avoid fixing heavy nails on grill chhajja, Parapet wall, dead wall.
- Always check & fill the joint of N.T & tiles in bathrooms, Kitchen & Toilet by cement on once a year.
- While Doing concealed plumbing please check the plumbing lines by pressure meter.
- Please purchase plumbing joints of standared company.
- Please check all the joints, valves, overflow pipes oncein year of loft tank.
- Tide up all the taps properly check out the washing machine / washbasin plumbing points.
- Washbasin drainage pips should be PVC. Barrel nipple of external water pips should be coved with PVC.
|
|
|
|
|